WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-S-31 A

2/7-S-31 A

Development, injectionPlugged

Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 17.12.2021 to 19.04.2024 (854 days), to 4 214,7 m.

Water depth72,4 m
Total depth4 214,7 m MD
Vertical depth2 786,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table81,6 m
Formation at total depth-
RigWest Elara
Spud17.12.2021
Completed19.04.2024
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2628 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient93 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-S-31 same well0,06 324,0--2017
2/7-S-31 B same well0,05 354,0--2024
2/7-S-260,06 248,0--2016
2/7-S-26 A0,06 235,0--2021
2/7-S-320,04 673,0--2021
2/7-S-360,05 891,0--2016
2/7-S-270,04 433,0--2021
2/7-S-370,05 930,0--2017

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗