WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-S-26 A

2/7-S-26 A

Development, productionProducingOil and gas

Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 06.06.2021 to 02.07.2021 (26 days), to 6 235,0 m.

Water depth72,1 m
Total depth6 235,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table81,6 m
Formation at total depth-
RigWest Elara
Spud06.06.2021
Completed02.07.2021
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2629 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient211 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-S-26 same well0,06 248,0--2016
2/7-S-310,06 324,0--2017
2/7-S-31 A0,04 214,7--2021
2/7-S-31 B0,05 354,0--2024
2/7-S-270,04 433,0--2021
2/7-S-210,05 513,0--2015
2/7-S-320,04 673,0--2021
2/7-S-220,04 846,0--2020

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗