2/7-U-1
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur in Embla, 22.04.1990 to 23.04.1990 (1 days), to 163,0 m.
Water depth70,3 m
Total depth163,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud22.04.1990
Completed23.04.1990
OperatorPhillips Petroleum Company Norway
Position56,3335 N, 3,2484 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Embla gradient | 35,5 °C/km |
| Estimated at total depth from the gradient | 7 °C |
The gradient is the median of 7 released wells in Embla with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.