Fields / 2/8-19
2/8-19
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Aker BP ASA with Maersk Invincible, 04.05.2022 to 25.05.2022 (21 days), to 875,0 m in the Nordland Group.
Water depth69,0 m
Total depth875,0 m MD
Vertical depth875,0 m TVD
Bottom-hole temperature27 °C
Max inclination2,7°
Rotary table53,2 m
Formation at total depthNordland Group
RigMaersk Invincible
Spud04.05.2022
Completed25.05.2022
OperatorAker BP ASA
Position56,3915 N, 3,4183 E
Formations
4 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 27 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Intermediate | 22" | 180,0 | 25" | 180,0 | - |
| Intermediate | 13 3/8" | 552,0 | 17 1/2" | 557,0 | 1,72 FIT |
| Intermediate | 9 5/8" | 706,0 | 12 1/4" | 707,0 | 1,79 LOT |
| Open hole | - | 875,0 | 8 1/2" | 875,0 | - |
Mud weight
6 measurements, one dot each, 1,00 to 1,36 g/cm³ against measured depth, water.