WellplannerNorwegian shelf well data

Fields / Volund / 24/9-P-1 H

24/9-P-1 H

Development, observationJunked

Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Volund, 28.01.2009 to 17.02.2009 (20 days), to 485,0 m.

Water depth123,0 m
Total depth485,0 m MD
Vertical depth485,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud28.01.2009
Completed17.02.2009
OperatorMarathon Petroleum Norge AS
Position59,4962 N, 1,9652 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Volund gradient35,3 °C/km
Estimated at total depth from the gradient16 °C

The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/9-P-1 AH same well0,0----
24/9-P-4 AH0,02 784,0--2009
24/9-P-4 H0,02 563,0--2009
24/9-P-2 AY1H0,04 137,0--2010
24/9-P-2 AY2H0,04 942,0--2010
24/9-P-2 H0,03 580,0--2009
24/9-P-5 AH0,03 510,0--2009
24/9-P-5 BH0,03 442,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗