Fields / Volund / 24/9-P-2 AY2H

24/9-P-2 AY2H

Development, productionClosedOil and gas

Drilled by Marathon Petroleum Norge AS with Songa Dee in Volund, 25.02.2010 to 14.04.2010 (48 days), to 4 942,0 m.

Water depth124,0 m
Total depth4 942,0 m MD
Vertical depth1 971,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigSonga Dee
Spud25.02.2010
Completed14.04.2010
OperatorMarathon Petroleum Norge AS
Position59,4961 N, 1,9648 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Volund gradient35,3 °C/km
Estimated at total depth from the gradient68 °C

The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/9-P-2 AY1H same well0,04 137,0--2010
24/9-P-2 H same well0,03 580,0--2009
24/9-P-5 AH0,03 510,0--2009
24/9-P-5 BH0,03 442,0--2021
24/9-P-5 H0,02 370,0--2009
24/9-P-1 AH0,0----
24/9-P-1 H0,0485,0--2009
24/9-P-4 AH0,02 784,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.