24/9-P-2 H
Development, observationPluggedOil and gas
Drilled by Marathon Petroleum Norge AS with Songa Dee in Volund, 24.12.2009 to 18.01.2010 (25 days), to 3 580,0 m.
Water depth124,0 m
Total depth3 580,0 m MD
Vertical depth2 169,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigSonga Dee
Spud24.12.2009
Completed18.01.2010
OperatorMarathon Petroleum Norge AS
Position59,4961 N, 1,9648 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Volund gradient | 35,3 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-P-2 AY1H same well | 0,0 | 4 137,0 | - | - | 2010 |
| 24/9-P-2 AY2H same well | 0,0 | 4 942,0 | - | - | 2010 |
| 24/9-P-5 AH | 0,0 | 3 510,0 | - | - | 2009 |
| 24/9-P-5 BH | 0,0 | 3 442,0 | - | - | 2021 |
| 24/9-P-5 H | 0,0 | 2 370,0 | - | - | 2009 |
| 24/9-P-1 AH | 0,0 | - | - | - | - |
| 24/9-P-1 H | 0,0 | 485,0 | - | - | 2009 |
| 24/9-P-4 AH | 0,0 | 2 784,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.