Fields / 25/10-10
25/10-10
Exploration, wildcatPlugged and abandonedDry
Drilled by ExxonMobil Exploration and Production Norway AS with Aker Barents, 01.03.2010 to 02.04.2010 (32 days), to 2 513,0 m in the Zechstein Group.
Water depth123,5 m
Total depth2 513,0 m MD
Vertical depth2 513,0 m TVD
Bottom-hole temperature-
Max inclination1,5°
Rotary table40,0 m
Formation at total depthZechstein Group
RigAker Barents
Spud01.03.2010
Completed02.04.2010
OperatorExxonMobil Exploration and Production Norway AS
Position59,1849 N, 2,2974 E
Formations
29 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/10-1 | 1,4 | 1 747,0 | 76 °C | 1,14 | 1969 |
| 25/10-1 R | 1,4 | 2 091,0 | 76 °C | - | 1970 |
| 25/10-5 | 1,6 | 2 011,0 | 55 °C | 1,25 | 1981 |
| 25/11-U-9 | 1,7 | 146,2 | - | - | 1999 |
| 25/11-U-10 | 1,7 | 145,5 | - | - | 1999 |
| 25/10-4 | 2,0 | 2 349,0 | 60 °C | 1,20 | 1980 |
| 25/10-4 R | 2,0 | 2 550,0 | 75 °C | 1,20 | 1981 |
| 25/11-U-29 | 2,3 | 128,9 | - | - | 1999 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 230,0 | 36" | 234,0 | - |
| Surface casing | 13 3/8" | 1 097,0 | 17 1/2" | 1 102,0 | - |
| Pilot hole | - | 1 102,0 | 9 7/8" | 1 102,0 | - |
| Open hole | - | 2 513,0 | 12 1/4" | 3 513,0 | - |
Mud weight
7 measurements, one dot each, 1,00 to 1,44 g/cm³ against measured depth, glydril, sweeps.