25/11-10
Exploration, appraisalPlugged and abandonedShows
Drilled by Esso Exploration and Production Norway A/S with Glomar Biscay Ii in Balder, 20.01.1981 to 17.02.1981 (28 days), to 1 988,0 m in the Ekofisk Formation.
Water depth124,0 m
Total depth1 988,0 m MD
Vertical depth1 988,0 m TVD
Bottom-hole temperature55 °C
Max inclination-
Rotary table25,0 m
Formation at total depthEkofisk Formation
RigGlomar Biscay Ii
Spud20.01.1981
Completed17.02.1981
OperatorEsso Exploration and Production Norway A/S
Position59,1691 N, 2,3494 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 55 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 66 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-7 | 1,1 | 1 944,0 | - | 1,13 | 1978 |
| 25/11-9 | 1,5 | 1 910,0 | 57 °C | 1,11 | 1980 |
| 25/11-BT-4 AY1H | 1,8 | 3 270,0 | - | - | 2025 |
| 25/11-BT-4 AY2H | 1,8 | 3 414,0 | - | - | 2025 |
| 25/11-BT-4 H | 1,8 | 2 778,0 | - | - | 2025 |
| 25/11-BT-1 H | 1,8 | 4 200,0 | - | - | 2023 |
| 25/11-BT-3 H | 1,8 | 4 550,0 | - | - | 2025 |
| 25/11-BT-3 Y2H | 1,8 | 4 374,0 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 211,0 | 36" | 212,0 | - |
| Intermediate | 13 3/8" | 470,0 | 17 1/2" | 485,0 | 1,63 LOT |
| Intermediate | 9 5/8" | 1 210,0 | 12 1/4" | 1 225,0 | 1,77 LOT |
| Open hole | - | 1 988,0 | 8 1/2" | 1 988,0 | - |
Mud weight
5 measurements, one dot each, 1,00 to 1,19 g/cm³ against measured depth, waterbased.