25/11-13
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Glomar Biscay Ii in Balder, 10.05.1981 to 29.05.1981 (19 days), to 1 932,0 m in the Tor Formation.
Water depth127,0 m
Total depth1 932,0 m MD
Vertical depth1 932,0 m TVD
Bottom-hole temperature55 °C
Max inclination3,0°
Rotary table25,0 m
Formation at total depthTor Formation
RigGlomar Biscay Ii
Spud10.05.1981
Completed29.05.1981
OperatorEsso Exploration and Production Norway A/S
Position59,1907 N, 2,3900 E
Formations
30 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 55 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-30 | 0,6 | 130,3 | - | - | 1999 |
| 25/11-6 | 0,9 | 1 948,0 | 65 °C | 1,14 | 1978 |
| 25/11-14 S | 1,2 | 1 908,0 | 85 °C | 1,50 | 1990 |
| 25/11-14 SR | 1,2 | 2 081,0 | 79 °C | - | 1990 |
| 25/11-12 | 1,2 | 1 918,0 | 60 °C | 1,19 | 1981 |
| 25/11-1 | 1,3 | 2 459,0 | 71 °C | - | 1966 |
| 25/11-C-3 AH | 1,3 | 2 273,0 | - | - | 1997 |
| 25/11-C-3 BH | 1,3 | 2 118,0 | - | - | 1997 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 215,0 | 36" | 216,0 | - |
| Intermediate | 13 3/8" | 483,0 | 17 1/2" | 500,0 | 1,66 LOT |
| Intermediate | 9 5/8" | 1 328,0 | 12 1/4" | 1 345,0 | 1,81 LOT |
| Open hole | - | 1 932,0 | 8 1/2" | 1 932,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,20 g/cm³ against measured depth, waterbased.