Fields / 25/11-17
25/11-17
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with West Delta, 01.03.1993 to 22.03.1993 (21 days), to 2 256,0 m in the Basement.
Water depth124,0 m
Total depth2 256,0 m MD
Vertical depth2 255,0 m TVD
Bottom-hole temperature105 °C
Max inclination3,3°
Rotary table29,0 m
Formation at total depthBasement
RigWest Delta
Spud01.03.1993
Completed22.03.1993
OperatorNorsk Hydro Produksjon AS
Position59,0574 N, 2,4852 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 105 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-29 S | 2,9 | 2 313,0 | - | 1,35 | 2019 |
| 25/11-U-48 | 2,9 | 1 197,0 | - | - | 2019 |
| 25/11-30 A | 8,3 | - | - | - | - |
| 25/11-30 S | 8,3 | 2 606,0 | - | - | 2025 |
| 25/11-28 | 8,7 | 2 590,0 | 102 °C | 1,60 | 2015 |
| 25/11-16 | 8,9 | 1 945,0 | 71 °C | 1,28 | 1992 |
| 25/11-24 | 9,7 | 2 117,0 | 81 °C | 1,35 | 2007 |
| 16/2-2 | 9,9 | 1 880,0 | 82 °C | 1,35 | 2001 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 237,0 | 36" | 237,0 | - |
| Intermediate | 9 5/8" | 1 398,0 | 12 1/4" | 1 413,0 | 1,80 LOT |
| Open hole | - | 2 256,0 | 8 1/2" | 2 256,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,28 g/cm³ against measured depth, water based.