25/11-2
Exploration, appraisalPlugged and abandonedShows
Drilled by Esso Exploration and Production Norway A/S with Glomar Grand Isle in Balder, 13.09.1970 to 24.09.1970 (11 days), to 1 824,0 m in the Sele Formation.
Water depth130,0 m
Total depth1 824,0 m MD
Vertical depth1 824,0 m TVD
Bottom-hole temperature61 °C
Max inclination-
Rotary table10,0 m
Formation at total depthSele Formation
RigGlomar Grand Isle
Spud13.09.1970
Completed24.09.1970
OperatorEsso Exploration and Production Norway A/S
Position59,2168 N, 2,4093 E
Formations
17 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 61 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 61 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-19 S | 0,6 | 2 250,0 | - | 1,42 | 1995 |
| 25/11-19 SR | 0,6 | 2 250,0 | - | - | 1997 |
| 25/11-U-22 | 0,6 | 131,8 | - | - | 1999 |
| 25/11-U-21 | 0,6 | 132,2 | - | - | 1999 |
| 25/11-U-37 | 0,9 | 130,9 | - | - | 1999 |
| 25/11-FT-4 AH | 0,9 | 4 116,0 | - | - | 2023 |
| 25/11-FT-4 H | 0,9 | 4 593,0 | - | - | 2022 |
| 25/11-FT-1 H | 0,9 | 3 219,0 | - | - | 2022 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 175,0 | 36" | 180,0 | - |
| Surface casing | 13 3/8" | 388,0 | 17 1/2" | 405,0 | - |
| Intermediate | 9 5/8" | 945,0 | 12 1/4" | 960,0 | - |
| Open hole | - | 1 856,0 | 8 1/2" | 1 856,0 | - |