Fields / 25/11-U-21
25/11-U-21
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 132,2 m.
Water depth129,2 m
Total depth132,2 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2203 N, 2,4014 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-22 | 0,0 | 131,8 | - | - | 1999 |
| 25/11-2 | 0,6 | 1 824,0 | 61 °C | - | 1970 |
| 25/11-19 S | 0,8 | 2 250,0 | - | 1,42 | 1995 |
| 25/11-19 SR | 0,8 | 2 250,0 | - | - | 1997 |
| 25/11-U-20 | 1,0 | 132,5 | - | - | 1999 |
| 25/11-FT-4 AH | 1,4 | 4 116,0 | - | - | 2023 |
| 25/11-FT-4 H | 1,4 | 4 593,0 | - | - | 2022 |
| 25/11-FT-1 H | 1,4 | 3 219,0 | - | - | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.