WellplannerNorwegian shelf well data

Fields / 25/11-U-22

25/11-U-22

Other, unknownPlugged and abandoned

Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 131,8 m.

Water depth129,0 m
Total depth131,8 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2203 N, 2,4015 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-U-210,0132,2--1999
25/11-20,61 824,061 °C-1970
25/11-19 S0,82 250,0-1,421995
25/11-19 SR0,82 250,0--1997
25/11-U-201,0132,5--1999
25/11-FT-4 AH1,44 116,0--2023
25/11-FT-4 H1,44 593,0--2022
25/11-FT-1 H1,43 219,0--2022

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗