Other, soil drillingPlugged and abandoned

Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 132,6 m.

Water depth129,6 m
Total depth132,6 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2655 N, 2,4656 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-U-80,9201,3--1999
25/11-U-60,9150,4--1999
25/8-C-140,95 612,0--2004
25/8-C-14 A0,95 405,0--2006
25/8-C-14 B0,94 920,0--2006
25/8-C-110,95 992,0--2003
25/8-C-11 A0,96 042,0--2003
25/8-C-11 B0,93 888,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.