Fields / 25/11-U-8
25/11-U-8
Other, soil drillingPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 201,3 m.
Water depth128,9 m
Total depth201,3 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2659 N, 2,4504 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-14 | 0,0 | 5 612,0 | - | - | 2004 |
| 25/8-C-14 A | 0,0 | 5 405,0 | - | - | 2006 |
| 25/8-C-14 B | 0,0 | 4 920,0 | - | - | 2006 |
| 25/8-C-24 | 0,0 | 5 442,0 | - | - | 2007 |
| 25/8-C-24 A | 0,0 | 5 504,0 | - | - | 2007 |
| 25/8-C-24 B | 0,0 | 5 956,0 | - | - | 2022 |
| 25/8-C-11 | 0,0 | 5 992,0 | - | - | 2003 |
| 25/8-C-11 A | 0,0 | 6 042,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.