25/2-C-1 AH
Development, productionPlugged and abandonedGas
Drilled by Elf Petroleum Norge AS with Mærsk Jutlander in Fulla, 30.06.1992 to 26.08.1992 (57 days), to 3 890,0 m.
Water depth112,0 m
Total depth3 890,0 m MD
Vertical depth3 856,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud30.06.1992
Completed26.08.1992
OperatorElf Petroleum Norge AS
Position59,9616 N, 2,3908 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fulla gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 133 °C |
The gradient is the median of 5 released wells in Fulla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-C-1 H same well | 0,0 | 3 940,0 | - | - | 1992 |
| 25/2-12 | 0,3 | 4 102,0 | 150 °C | 1,92 | 1988 |
| 25/2-12 A | 0,3 | 3 865,0 | 130 °C | 1,95 | 1988 |
| 25/2-C-2 H | 0,5 | 3 867,0 | - | - | 1992 |
| 25/2-C-3 H | 1,2 | 3 982,0 | - | - | 1993 |
| 25/2-4 | 2,0 | 4 360,0 | 144 °C | 1,94 | 1975 |
| 25/2-U-10 | 4,0 | - | - | - | 2021 |
| 25/2-23 A | 4,1 | 2 133,0 | 63 °C | 1,39 | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.