25/2-C-3 H
Development, productionPlugged and abandonedGas
Drilled by Elf Petroleum Norge AS with Mærsk Jutlander in Fulla, 12.03.1993 to 30.08.1993 (171 days), to 3 982,0 m.
Water depth112,0 m
Total depth3 982,0 m MD
Vertical depth3 888,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud12.03.1993
Completed30.08.1993
OperatorElf Petroleum Norge AS
Position59,9724 N, 2,3852 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fulla gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 134 °C |
The gradient is the median of 5 released wells in Fulla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-C-2 H | 0,7 | 3 867,0 | - | - | 1992 |
| 25/2-4 | 0,7 | 4 360,0 | 144 °C | 1,94 | 1975 |
| 25/2-12 | 1,1 | 4 102,0 | 150 °C | 1,92 | 1988 |
| 25/2-12 A | 1,1 | 3 865,0 | 130 °C | 1,95 | 1988 |
| 25/2-C-1 AH | 1,2 | 3 890,0 | - | - | 1992 |
| 25/2-C-1 H | 1,2 | 3 940,0 | - | - | 1992 |
| 30/11-F-1 H | 3,2 | - | - | - | 2026 |
| 30/11-F-1 AH | 3,2 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.