WellplannerNorwegian shelf well data

Fields / Fulla / 25/2-4

25/2-4

Exploration, wildcatPlugged and abandonedGas and condensate

Drilled by Elf Petroleum Norge AS with Neptune 7 in Fulla, 14.05.1975 to 20.10.1975 (159 days), to 4 360,0 m in the Smith Bank Formation.

Water depth113,0 m
Total depth4 360,0 m MD
Vertical depth-
Bottom-hole temperature144 °C
Max inclination-
Rotary table24,0 m
Formation at total depthSmith Bank Formation
RigNeptune 7
Spud14.05.1975
Completed20.10.1975
OperatorElf Petroleum Norge AS
Position59,9789 N, 2,3830 E

Formations

35 tops reported, measured depth in metres.

GroupsNordland Group, top 137,0 mNordland GpHordaland Group, top 1 025,0 mHordaland GpRogaland Group, top 2 098,0 mRogaland GpShetland Group, top 2 617,0 mShetland GpViking Group, top 3 632,0 mVestland Group, top 3 639,5 mVestland GpDunlin Group, top 3 876,0 mDunlin GpStatfjord Group, top 4 084,0 mStatfjord GpNo Group Defined, top 4 261,0 mFormationsUtsira Formation, top 427,0 mUtsira FmSkade Formation, top 1 077,0 mNo Formal Name, top 1 111,0 mGrid Formation, top 1 213,0 mNo Formal Name, top 1 250,0 mNo Formal NameFrigg Formation, top 2 012,0 mNo Formal Name, top 2 061,0 mIntra Balder Fm Ss, top 2 098,0 mBalder Formation, top 2 177,0 mIntra Balder Fm Ss, top 2 208,0 mSele Formation, top 2 223,0 mHermod Formation, top 2 250,0 mLista Formation, top 2 325,0 mVåle Formation, top 2 400,0 mVåle FmTy Formation, top 2 590,0 mVåle Formation, top 2 606,0 mHardråde Formation, top 2 617,0 mHardråde FmKyrre Formation, top 2 925,0 mKyrre FmTryggvason Formation, top 3 370,0 mTryggvason FmDraupne Formation, top 3 632,0 mHugin Formation, top 3 639,5 mSleipner Formation, top 3 752,0 mDrake Formation, top 3 876,0 mCook Formation, top 3 927,0 mAmundsen Formation, top 3 965,0 mAmundsen FmSmith Bank Formation, top 4 261,0 m1371 0002 0003 0004 0004 360

Temperature

Reported at total depth144 °C
Fulla gradient34,7 °C/km
Estimated at total depth from the gradient151 °C

The gradient is the median of 5 released wells in Fulla with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/2-C-3 H0,73 982,0--1993
25/2-C-2 H1,43 867,0--1992
25/2-121,84 102,0150 °C1,921988
25/2-12 A1,83 865,0130 °C1,951988
25/2-C-1 AH2,03 890,0--1992
25/2-C-1 H2,03 940,0--1992
30/11-F-1 H2,5---2026
30/11-F-6 H2,5---2026

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"195,036"200,0-
Intermediate20"723,026"733,0-
Intermediate13 3/8"2 860,017 1/2"2 870,0-
Intermediate9 5/8"3 353,012 1/4"3 374,0-
Open hole-4 360,08 1/2"4 360,0-

Mud weight

9 measurements, one dot each, 1,00 to 1,94 g/cm³ against measured depth, water based.

1,01,21,41,61,82,001 0002 0003 0004 000136,0 m: 1,06 g/cm³, water based700,0 m: 1,05 g/cm³, water based1 437,0 m: 1,18 g/cm³, water based2 147,0 m: 1,25 g/cm³, water based3 380,0 m: 1,91 g/cm³, water based3 640,0 m: 1,92 g/cm³, water based3 915,0 m: 1,93 g/cm³, water based4 260,0 m: 1,94 g/cm³, water based4 360,0 m: 1,77 g/cm³, water based

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
12 902,0 - 2 911,0-----
Show on the mapOpen on FactPages ↗