Fields / Hugin Satellitter / 25/2-S-4 BH
25/2-S-4 BH
Development, observationDrilling
Being drilled by Aker BP ASA with Scarabeo 8 in Hugin Satellitter. Spudded 22.10.2026 and still drilling: day 28.
Water depth122,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud22.10.2026
Completed-
OperatorAker BP ASA
Position59,8129 N, 2,6201 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hugin Satellitter gradient | 33,8 °C/km |
The gradient is the median of 11 released wells in Hugin Satellitter with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-S-4 AH same well | 0,0 | - | - | - | 2026 |
| 25/2-S-4 CH same well | 0,0 | - | - | - | 2026 |
| 25/2-S-4 H same well | 0,0 | 4 556,0 | - | - | 2026 |
| 25/2-U-14 | 0,0 | 1 300,0 | - | - | 2023 |
| 25/2-18 A | 1,5 | 4 066,0 | 125 °C | 1,40 | 2016 |
| 25/2-18 B | 1,5 | 4 335,0 | 127 °C | 1,40 | 2016 |
| 25/2-18 C | 1,5 | 4 369,0 | 133 °C | 1,30 | 2016 |
| 25/2-18 S | 1,5 | 3 887,0 | 129 °C | 1,30 | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.