Fields / 25/2-U-14
25/2-U-14
Other, soil drillingPlugged
Drilled by Aker BP ASA with Scarabeo 8, 21.11.2023 to 22.11.2023 (1 days), to 1 300,0 m.
Water depth121,0 m
Total depth1 300,0 m MD
Vertical depth1 287,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,7 m
Formation at total depth-
RigScarabeo 8
Spud21.11.2023
Completed22.11.2023
OperatorAker BP ASA
Position59,8130 N, 2,6201 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-S-4 AH | 0,0 | - | - | - | 2026 |
| 25/2-S-4 BH | 0,0 | - | - | - | 2026 |
| 25/2-S-4 CH | 0,0 | - | - | - | 2026 |
| 25/2-S-4 H | 0,0 | 4 556,0 | - | - | 2026 |
| 25/2-18 A | 1,5 | 4 066,0 | 125 °C | 1,40 | 2016 |
| 25/2-18 B | 1,5 | 4 335,0 | 127 °C | 1,40 | 2016 |
| 25/2-18 C | 1,5 | 4 369,0 | 133 °C | 1,30 | 2016 |
| 25/2-18 S | 1,5 | 3 887,0 | 129 °C | 1,30 | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.