Fields / 25/2-U-15
25/2-U-15
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 19.11.2023 to 21.11.2023 (2 days), to 1 356,0 m.
Water depth117,0 m
Total depth1 356,0 m MD
Vertical depth1 355,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,7 m
Formation at total depth-
RigScarabeo 8
Spud19.11.2023
Completed21.11.2023
OperatorAker BP ASA
Position59,7846 N, 2,4347 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-E-4 H | 0,0 | - | - | - | 2026 |
| 25/2-E-6 H | 0,0 | - | - | - | 2026 |
| 25/2-13 | 1,5 | 3 908,0 | 128 °C | 1,27 | 1989 |
| 25/2-5 | 2,7 | 4 000,0 | 112 °C | - | 1976 |
| 25/2-16 S | 3,9 | 4 013,0 | 121 °C | 1,50 | 2001 |
| 25/5-U-9 | 4,9 | 151,3 | - | - | 2008 |
| 25/5-U-7 | 5,0 | 164,3 | - | - | 2008 |
| 25/5-U-8 | 5,0 | 151,6 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.