Drilled by Norsk Hydro Produksjon AS with Transocean Arctic, 03.08.2001 to 13.09.2001 (41 days), to 4 013,0 m in the Dunlin Group.
Water depth115,0 m
Total depth4 013,0 m MD
Vertical depth3 792,4 m TVD
Bottom-hole temperature121 °C
Max inclination29,0°
Rotary table24,0 m
Formation at total depthDunlin Group
RigTransocean Arctic
Spud03.08.2001
Completed13.09.2001
OperatorNorsk Hydro Produksjon AS
Position59,7521 N, 2,4092 E
Formations
41 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 121 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/5-U-9 | 1,1 | 151,3 | - | - | 2008 |
| 25/5-U-7 | 1,1 | 164,3 | - | - | 2008 |
| 25/5-U-8 | 1,2 | 151,6 | - | - | 2008 |
| 25/5-6 | 1,6 | 2 446,0 | - | 1,39 | 2009 |
| 25/2-E-6 H | 3,9 | - | - | - | 2026 |
| 25/2-U-15 | 3,9 | 1 356,0 | - | - | 2023 |
| 25/2-E-4 H | 3,9 | - | - | - | 2026 |
| 25/2-13 | 5,3 | 3 908,0 | 128 °C | 1,27 | 1989 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 223,0 | 36" | 223,0 | - |
| Surface casing | 13 3/8" | 1 151,0 | 17 1/2" | 1 155,0 | 1,54 LOT |
| Intermediate | 9 5/8" | 3 179,0 | 12 1/4" | 3 185,0 | 1,84 LOT |
| Open hole | - | 4 013,0 | 8 1/2" | 4 013,0 | - |
Mud weight
21 measurements, one dot each, 1,00 to 1,50 g/cm³ against measured depth, oil based, water based.