Fields / 25/5-U-7
25/5-U-7
Other, soil drillingPlugged and abandoned
Drilled by Lundin Norway AS with Bucentaur, 28.01.2008 to 28.01.2008 (0 days), to 164,3 m.
Water depth119,3 m
Total depth164,3 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud28.01.2008
Completed28.01.2008
OperatorLundin Norway AS
Position59,7447 N, 2,3952 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-U-8 | 0,1 | 151,6 | - | - | 2008 |
| 25/5-U-9 | 0,1 | 151,3 | - | - | 2008 |
| 25/5-6 | 0,7 | 2 446,0 | - | 1,39 | 2009 |
| 25/2-16 S | 1,1 | 4 013,0 | 121 °C | 1,50 | 2001 |
| 25/2-E-6 H | 5,0 | - | - | - | 2026 |
| 25/2-U-15 | 5,0 | 1 356,0 | - | - | 2023 |
| 25/2-E-4 H | 5,0 | - | - | - | 2026 |
| 25/4-6 S | 5,8 | 4 170,0 | 143 °C | 1,75 | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.