Fields / 25/5-6
25/5-6
Exploration, wildcatPlugged and abandonedDry
Drilled by Lundin Norway AS with Transocean Winner, 27.08.2009 to 19.09.2009 (23 days), to 2 446,0 m in the Heimdal Formation.
Water depth118,0 m
Total depth2 446,0 m MD
Vertical depth2 446,0 m TVD
Bottom-hole temperature-
Max inclination1,1°
Rotary table26,0 m
Formation at total depthHeimdal Formation
RigTransocean Winner
Spud27.08.2009
Completed19.09.2009
OperatorLundin Norway AS
Position59,7386 N, 2,3980 E
Formations
14 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 221,0 | 36" | 223,0 | - |
| Surface casing | 20" | 331,0 | 26" | 337,0 | - |
| Intermediate | 13 3/8" | 1 150,0 | 17 1/2" | 1 158,0 | 1,68 LOT |
| Open hole | - | 2 446,0 | 8 1/2" | 2 446,0 | - |
Mud weight
6 measurements, one dot each, 1,00 to 1,39 g/cm³ against measured depth, water.