Fields / Vilje / 25/4-D-1 AH

25/4-D-1 AH

Development, productionProducingOil

Drilled by Norsk Hydro Petroleum AS with Deepsea Delta in Vilje, 06.06.2007 to 17.06.2007 (11 days), to 3 672,0 m.

Water depth122,0 m
Total depth3 672,0 m MD
Vertical depth2 179,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigDeepsea Delta
Spud06.06.2007
Completed17.06.2007
OperatorNorsk Hydro Petroleum AS
Position59,6561 N, 2,2780 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

1 released well in Vilje report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/4-D-1 H same well0,02 844,0--2006
25/4-E-1 AH0,02 930,0--2007
25/4-E-1 BY1H0,03 856,0--2007
25/4-E-1 BY2H0,03 784,0--2007
25/4-E-1 H0,03 100,0--2006
25/4-F-1 AH0,13 583,0--2013
25/4-F-1 H0,12 850,0--2013
25/4-9 S1,82 377,080 °C1,352003

Casing and formation tests

No casing programme is reported for this wellbore.