Fields / Vilje / 25/4-E-1 BY2H
25/4-E-1 BY2H
Development, productionClosedOil
Drilled by Norsk Hydro Petroleum AS with Deepsea Delta in Vilje, 27.08.2007 to 09.09.2007 (13 days), to 3 784,0 m.
Water depth122,0 m
Total depth3 784,0 m MD
Vertical depth2 179,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigDeepsea Delta
Spud27.08.2007
Completed09.09.2007
OperatorNorsk Hydro Petroleum AS
Position59,6564 N, 2,2784 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Vilje report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/4-E-1 AH same well | 0,0 | 2 930,0 | - | - | 2007 |
| 25/4-E-1 BY1H same well | 0,0 | 3 856,0 | - | - | 2007 |
| 25/4-E-1 H same well | 0,0 | 3 100,0 | - | - | 2006 |
| 25/4-D-1 AH | 0,0 | 3 672,0 | - | - | 2007 |
| 25/4-D-1 H | 0,0 | 2 844,0 | - | - | 2006 |
| 25/4-F-1 AH | 0,0 | 3 583,0 | - | - | 2013 |
| 25/4-F-1 H | 0,0 | 2 850,0 | - | - | 2013 |
| 25/4-9 S | 1,8 | 2 377,0 | 80 °C | 1,35 | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.