25/4-F-1 AH
Development, productionClosedOil
Drilled by Marathon Oil Norge AS with Transocean Winner in Vilje, 26.04.2013 to 15.03.2014 (323 days), to 3 583,0 m.
Water depth122,0 m
Total depth3 583,0 m MD
Vertical depth2 214,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigTransocean Winner
Spud26.04.2013
Completed15.03.2014
OperatorMarathon Oil Norge AS
Position59,6566 N, 2,2788 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Vilje report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/4-F-1 H same well | 0,0 | 2 850,0 | - | - | 2013 |
| 25/4-E-1 AH | 0,0 | 2 930,0 | - | - | 2007 |
| 25/4-E-1 BY1H | 0,0 | 3 856,0 | - | - | 2007 |
| 25/4-E-1 BY2H | 0,0 | 3 784,0 | - | - | 2007 |
| 25/4-E-1 H | 0,0 | 3 100,0 | - | - | 2006 |
| 25/4-D-1 AH | 0,1 | 3 672,0 | - | - | 2007 |
| 25/4-D-1 H | 0,1 | 2 844,0 | - | - | 2006 |
| 25/4-9 S | 1,8 | 2 377,0 | 80 °C | 1,35 | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.