Fields / 25/4-U-6
25/4-U-6
Other, shallow gasSuspended
Drilled by Aker BP ASA with Scarabeo 8, 12.03.2023 to 13.03.2023 (1 days), to 556,0 m.
Water depth119,4 m
Total depth556,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,7 m
Formation at total depth-
RigScarabeo 8
Spud12.03.2023
Completed13.03.2023
OperatorAker BP ASA
Position59,6765 N, 2,2054 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/4-U-1 | 0,1 | 229,0 | - | - | 2023 |
| 25/4-15 | 0,1 | 2 444,0 | 85 °C | 1,26 | 2023 |
| 25/4-9 S | 4,1 | 2 377,0 | 80 °C | 1,35 | 2003 |
| 25/4-D-1 AH | 4,7 | 3 672,0 | - | - | 2007 |
| 25/4-D-1 H | 4,7 | 2 844,0 | - | - | 2006 |
| 25/4-E-1 AH | 4,7 | 2 930,0 | - | - | 2007 |
| 25/4-E-1 BY1H | 4,7 | 3 856,0 | - | - | 2007 |
| 25/4-E-1 BY2H | 4,7 | 3 784,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.