30/11-U-3
Other, shallow gasPlugged
Drilled by Equinor Energy AS with West Hercules in Munin, 14.06.2021 to 16.06.2021 (2 days), to 1 231,0 m.
Water depth107,0 m
Total depth1 231,0 m MD
Vertical depth1 231,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigWest Hercules
Spud14.06.2021
Completed16.06.2021
OperatorEquinor Energy AS
Position60,1105 N, 2,5935 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Munin gradient | 36,0 °C/km |
| Estimated at total depth from the gradient | 43 °C |
The gradient is the median of 12 released wells in Munin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/11-V-6 H | 0,1 | - | - | - | 2026 |
| 30/11-V-2 H | 0,1 | - | - | - | 2025 |
| 30/11-V-4 H | 0,1 | 3 647,0 | - | - | 2025 |
| 30/11-V-3 H | 0,1 | 6 148,0 | - | - | 2025 |
| 30/11-W-1 H | 0,1 | 6 320,0 | - | - | 2026 |
| 30/11-W-6 H | 0,1 | 7 013,0 | - | - | 2025 |
| 30/11-W-2 AH | 0,1 | - | - | - | 2026 |
| 30/11-W-2 BH | 0,1 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.