Fields / Oseberg / 30/9-B-18 A
30/9-B-18 A
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 27.09.1992 to 23.10.1992 (26 days), to 4 982,0 m in the Ness Formation.
Water depth109,0 m
Total depth4 982,0 m MD
Vertical depth2 761,0 m TVD
Bottom-hole temperature106 °C
Max inclination93,4°
Rotary table58,0 m
Formation at total depthNess Formation
RigOseberg B
Spud27.09.1992
Completed23.10.1992
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8287 E
Formations
23 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 106 °C |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 30/9-B-18 same well | 0,0 | 3 980,0 | - | 1,55 | 1992 |
| 30/9-B-18 B same well | 0,0 | 5 026,0 | - | - | 2017 |
| 30/9-B-17 | 0,0 | 4 556,0 | - | - | 1993 |
| 30/9-B-12 | 0,0 | 3 880,0 | - | - | 1990 |
| 30/9-B-12 A | 0,0 | 3 992,0 | - | - | 1991 |
| 30/9-B-12 B | 0,0 | 6 270,0 | - | - | 1999 |
| 30/9-B-12 C | 0,0 | 5 020,0 | - | - | 2011 |
| 30/9-B-24 | 0,0 | 3 538,0 | - | - | 1986 |
Casing and formation tests
No casing programme is reported for this wellbore.
Mud weight
28 measurements, one dot each, 1,20 to 1,22 g/cm³ against measured depth, oil based.