Fields / 31/5-7
31/5-7
Exploration, wildcat-ccsPluggedWater
Drilled by Northern Lights JV DA with West Hercules, 02.12.2019 to 06.03.2020 (95 days), to 2 915,0 m in the Statfjord Group.
Water depth307,0 m
Total depth2 915,0 m MD
Vertical depth2 914,9 m TVD
Bottom-hole temperature115 °C
Max inclination1,7°
Rotary table31,0 m
Formation at total depthStatfjord Group
RigWest Hercules
Spud02.12.2019
Completed06.03.2020
OperatorNorthern Lights JV DA
Position60,5764 N, 3,4434 E
Formations
35 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 115 °C |
| Drill-stem test at 2 805,0 m | 110 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-A-7 AH | 0,0 | 2 825,0 | - | - | 2022 |
| 31/5-C-1 H | 7,1 | 2 935,0 | - | - | 2022 |
| 31/5-U-2 | 11,7 | 115,0 | - | - | 1987 |
| 31/5-B-4 H | 11,7 | 1 642,0 | - | - | 1990 |
| 31/5-B-5 H | 11,7 | 1 670,0 | - | - | 1990 |
| 31/5-B-2 H | 11,7 | 1 661,0 | - | - | 1990 |
| 31/5-U-1 | 11,7 | 70,0 | - | - | 1987 |
| 31/5-B-3 H | 11,7 | 1 673,0 | - | - | 1990 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 407,0 | 36" | 411,0 | - |
| Surface casing | 20" | 925,0 | 26" | 931,0 | 1,54 LOT |
| Intermediate | 13 5/8" | 1 897,0 | 17 1/2" | 1 906,0 | 1,57 LOT |
| Liner | 9 5/8" | 2 583,0 | 12 1/4" | 2 584,0 | 1,54 LOT |
| Open hole | - | 2 915,0 | 8 1/2" | 2 915,0 | - |
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 2 697,5 - 2 805,0 | 17,4 | - | 110 | - | 600 |