Fields / 31/5-A-7 AH
31/5-A-7 AH
Development, injection-ccsInjectingCo2
Drilled by Northern Lights JV DA with Transocean Enabler, 09.10.2022 to 01.11.2022 (23 days), to 2 825,0 m.
Water depth307,0 m
Total depth2 825,0 m MD
Vertical depth2 818,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,1 m
Formation at total depth-
RigTransocean Enabler
Spud09.10.2022
Completed01.11.2022
OperatorNorthern Lights JV DA
Position60,5764 N, 3,4434 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-7 | 0,0 | 2 915,0 | 115 °C | - | 2019 |
| 31/5-C-1 H | 7,1 | 2 935,0 | - | - | 2022 |
| 31/5-U-2 | 11,7 | 115,0 | - | - | 1987 |
| 31/5-B-4 H | 11,7 | 1 642,0 | - | - | 1990 |
| 31/5-B-5 H | 11,7 | 1 670,0 | - | - | 1990 |
| 31/5-B-2 H | 11,7 | 1 661,0 | - | - | 1990 |
| 31/5-U-1 | 11,7 | 70,0 | - | - | 1987 |
| 31/5-B-3 H | 11,7 | 1 673,0 | - | - | 1990 |
Casing and formation tests
No casing programme is reported for this wellbore.