Fields / Troll / 31/5-I-32 Y2H
31/5-I-32 Y2H
Development, productionClosedOil
Drilled by Norsk Hydro Produksjon AS with West Venture in Troll, 01.03.2003 to 13.03.2003 (12 days), to 4 933,0 m.
Water depth314,0 m
Total depth4 933,0 m MD
Vertical depth1 594,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table35,5 m
Formation at total depth-
RigWest Venture
Spud01.03.2003
Completed13.03.2003
OperatorNorsk Hydro Produksjon AS
Position60,7169 N, 3,5987 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-I-32 Y1H same well | 0,0 | 5 006,0 | - | - | 2003 |
| 31/5-I-22 AH | 1,7 | 4 500,0 | - | - | 1997 |
| 31/5-I-22 BY1H | 1,7 | 5 289,0 | - | - | 2013 |
| 31/5-I-22 BY2H | 1,7 | 5 608,0 | - | - | 2013 |
| 31/5-I-22 BY3H | 1,7 | 4 630,0 | - | - | 2013 |
| 31/5-I-22 H | 1,7 | 2 002,0 | - | - | 1997 |
| 31/5-I-21 AH | 1,7 | 5 060,0 | - | - | 1998 |
| 31/5-I-21 BY1H | 1,7 | 5 327,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.