WellplannerNorwegian shelf well data

Fields / Visund / 34/8-4 A

34/8-4 A

Exploration, appraisalPlugged and abandonedOil

Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Visund, 18.02.1992 to 27.05.1992 (99 days), to 3 567,0 m in the Lunde Formation.

Water depth309,0 m
Total depth3 567,0 m MD
Vertical depth3 313,0 m TVD
Bottom-hole temperature123 °C
Max inclination33,3°
Rotary table23,5 m
Formation at total depthLunde Formation
RigTransocean 8
Spud18.02.1992
Completed27.05.1992
OperatorNorsk Hydro Produksjon AS
Position61,3249 N, 2,4219 E

Formations

14 tops reported, measured depth in metres.

GroupsNordland Group, top 332,5 mNordland GpHordaland Group, top 1 108,5 mHordaland GpRogaland Group, top 1 819,5 mRogaland GpShetland Group, top 2 030,5 mShetland GpCromer Knoll Group, top 2 894,0 mDunlin Group, top 2 902,5 mDunlin GpStatfjord Group, top 3 057,0 mHegre Group, top 3 143,3 mHegre GpFormationsUtsira Formation, top 1 071,5 mUtsira FmBalder Formation, top 1 819,5 mSele Formation, top 1 862,5 mLista Formation, top 1 875,5 mLista FmAmundsen Formation, top 2 902,5 mAmundsen FmLunde Formation, top 3 143,3 mLunde Fm3321 0002 0003 0003 567

Temperature

Reported at total depth123 °C
Drill-stem test at 3 341,0 m118 °C
Visund gradient39,6 °C/km
Estimated at total depth from the gradient122 °C

The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/8-4 AR same well0,03 574,0123 °C-2003
34/8-4 S same well0,04 150,0137 °C1,731990
34/8-9 S2,23 530,0118 °C1,671992
34/8-10 S3,83 470,0122 °C1,701993
34/8-53,93 540,0113 °C1,611991
34/8-U-24,1---2009
34/8-V-4 AH4,14 160,0--2011
34/8-V-4 BY1H4,14 721,0--2012

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"417,036"420,0-
Intermediate18 5/8"1 146,026"1 150,01,58 LOT
Intermediate13 3/8"2 161,017 1/2"2 165,01,78 LOT
Intermediate9 5/8"3 567,012 1/4"3 567,0-

Mud weight

37 measurements, one dot each, 1,60 to 1,71 g/cm³ against measured depth, water based.

1,61,71,801 0002 0003 000550,0 m: 1,71 g/cm³, WATER BASED2 188,0 m: 1,64 g/cm³, WATER BASED2 230,0 m: 1,70 g/cm³, WATER BASED2 250,0 m: 1,64 g/cm³, WATER BASED2 434,0 m: 1,64 g/cm³, WATER BASED2 509,0 m: 1,63 g/cm³, WATER BASED2 615,0 m: 1,64 g/cm³, WATER BASED2 700,0 m: 1,70 g/cm³, WATER BASED2 813,0 m: 1,64 g/cm³, WATER BASED2 909,0 m: 1,64 g/cm³, WATER BASED2 914,0 m: 1,64 g/cm³, WATER BASED2 994,0 m: 1,64 g/cm³, WATER BASED3 012,0 m: 1,70 g/cm³, WATER BASED3 037,0 m: 1,70 g/cm³, WATER BASED3 042,0 m: 1,65 g/cm³, WATER BASED3 073,0 m: 1,66 g/cm³, WATER BASED3 103,0 m: 1,66 g/cm³, WATER BASED3 114,0 m: 1,66 g/cm³, WATER BASED3 120,0 m: 1,66 g/cm³, WATER BASED3 144,0 m: 1,70 g/cm³, WATER BASED3 147,0 m: 1,66 g/cm³, WATER BASED3 150,0 m: 1,70 g/cm³, WATER BASED3 156,0 m: 1,66 g/cm³, WATER BASED3 156,0 m: 1,66 g/cm³, WATER BASED3 183,0 m: 1,65 g/cm³, WATER BASED3 197,0 m: 1,70 g/cm³, WATER BASED3 198,0 m: 1,65 g/cm³, WATER BASED3 200,0 m: 1,65 g/cm³, WATER BASED3 202,0 m: 1,65 g/cm³, WATER BASED3 248,0 m: 1,70 g/cm³, WATER BASED3 259,0 m: 1,65 g/cm³, WATER BASED3 272,0 m: 1,65 g/cm³, WATER BASED3 342,0 m: 1,65 g/cm³, WATER BASED3 447,0 m: 1,65 g/cm³, WATER BASED3 500,0 m: 1,71 g/cm³, WATER BASED3 504,0 m: 1,65 g/cm³, WATER BASED3 567,0 m: 1,64 g/cm³, WATER BASED

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
52 988,0 - 3 019,014,344,0109992225 184
43 056,0 - 3 108,012,745,0110831181 158
33 160,0 - 3 184,019,027,0113821170 768
23 214,0 - 3 228,012,77,01053515 680
13 323,0 - 3 341,014,249,0118936211 536
Show on the mapOpen on FactPages ↗