Fields / Visund / 34/8-4 S
34/8-4 S
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander in Visund, 06.12.1990 to 09.06.1991 (185 days), to 4 150,0 m in the Teist Fm (informal).
Water depth309,0 m
Total depth4 150,0 m MD
Vertical depth3 802,0 m TVD
Bottom-hole temperature137 °C
Max inclination56,3°
Rotary table23,0 m
Formation at total depthTeist Fm (informal)
RigMærsk Jutlander
Spud06.12.1990
Completed09.06.1991
OperatorNorsk Hydro Produksjon AS
Position61,3249 N, 2,4219 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 137 °C |
| Drill-stem test at 3 241,0 m | 113 °C |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 141 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-4 A same well | 0,0 | 3 567,0 | 123 °C | 1,71 | 1992 |
| 34/8-4 AR same well | 0,0 | 3 574,0 | 123 °C | - | 2003 |
| 34/8-9 S | 2,2 | 3 530,0 | 118 °C | 1,67 | 1992 |
| 34/8-10 S | 3,8 | 3 470,0 | 122 °C | 1,70 | 1993 |
| 34/8-5 | 3,9 | 3 540,0 | 113 °C | 1,61 | 1991 |
| 34/8-U-2 | 4,1 | - | - | - | 2009 |
| 34/8-V-4 AH | 4,1 | 4 160,0 | - | - | 2011 |
| 34/8-V-4 BY1H | 4,1 | 4 721,0 | - | - | 2012 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 417,0 | 36" | 421,0 | - |
| Intermediate | 18 5/8" | 1 146,0 | 24" | 1 451,0 | 1,58 LOT |
| Intermediate | 13 3/8" | 2 161,0 | 17 1/2" | 2 800,0 | 1,78 LOT |
| Intermediate | 9 5/8" | 3 662,0 | 12 1/4" | 3 673,0 | 2,07 LOT |
| Open hole | - | 4 150,0 | 8 1/2" | 4 150,0 | - |
Mud weight
160 measurements, one dot each, 1,00 to 1,73 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 4 | 2 903,0 - 2 917,0 | 25,4 | - | - | 205 | 480 000 |
| 3 | 3 000,0 - 3 017,0 | 21,4 | - | 110 | 908 | 708 000 |
| 2.2 | 3 066,0 - 3 142,0 | 20,6 | - | 112 | 985 | 792 000 |
| 2.1 | 3 133,0 - 3 143,0 | 17,4 | - | 114 | 754 | 605 000 |
| 1 | 3 219,0 - 3 241,0 | 15,8 | - | 113 | 441 | 410 130 |