Fields / 34/8-7
34/8-7
Exploration, wildcatSuspendedGas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer, 21.03.1992 to 16.07.1992 (117 days), to 5 460,0 m in the Lunde Formation.
Water depth335,0 m
Total depth5 460,0 m MD
Vertical depth5 441,4 m TVD
Bottom-hole temperature181 °C
Max inclination12,8°
Rotary table23,0 m
Formation at total depthLunde Formation
RigPolar Pioneer
Spud21.03.1992
Completed16.07.1992
OperatorNorsk Hydro Produksjon AS
Position61,3192 N, 2,5589 E
Formations
42 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 181 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-7 R same well | 0,0 | 5 460,0 | 181 °C | 1,84 | 1992 |
| 34/8-16 S | 5,5 | 3 875,0 | 139 °C | 1,65 | 2015 |
| 34/8-2 | 5,9 | 3 240,0 | 122 °C | 1,70 | 1986 |
| 34/8-10 S | 6,8 | 3 470,0 | 122 °C | 1,70 | 1993 |
| 34/8-11 | 7,2 | 3 140,0 | 119 °C | 1,68 | 1993 |
| 34/8-4 A | 7,3 | 3 567,0 | 123 °C | 1,71 | 1992 |
| 34/8-4 AR | 7,3 | 3 574,0 | 123 °C | - | 2003 |
| 34/8-4 S | 7,3 | 4 150,0 | 137 °C | 1,73 | 1990 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 444,5 | 36" | 446,0 | - |
| Intermediate | 18 5/8" | 1 436,0 | 26" | 1 438,0 | 1,65 LOT |
| Intermediate | 13 3/8" | 3 264,0 | 17 1/2" | 3 270,0 | 1,89 LOT |
| Intermediate | 9 5/8" | 3 945,0 | 12 1/4" | 3 947,0 | 2,00 LOT |
| Liner | 7" | 5 460,0 | 8 1/2" | 5 460,0 | - |
Mud weight
71 measurements, one dot each, 1,00 to 1,82 g/cm³ against measured depth, water based.