Fields / 34/8-2
34/8-2
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer, 04.10.1986 to 17.11.1986 (44 days), to 3 240,0 m in the Lunde Formation.
Water depth353,0 m
Total depth3 240,0 m MD
Vertical depth3 239,0 m TVD
Bottom-hole temperature122 °C
Max inclination2,5°
Rotary table23,0 m
Formation at total depthLunde Formation
RigPolar Pioneer
Spud04.10.1986
Completed17.11.1986
OperatorNorsk Hydro Produksjon AS
Position61,3696 N, 2,5267 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 122 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-8 | 2,8 | 3 625,0 | 125 °C | 1,70 | 1992 |
| 34/8-8 R | 2,8 | 3 624,0 | 130 °C | 1,63 | 1993 |
| 34/8-A-37 H | 3,6 | 6 691,0 | - | - | 2026 |
| 34/8-A-38 H | 3,6 | 4 977,0 | - | - | 2022 |
| 34/8-A-26 H | 3,6 | 5 609,0 | - | - | 2009 |
| 34/8-A-2 H | 3,6 | 6 310,0 | - | - | 1997 |
| 34/8-A-1 AH | 3,6 | 4 582,0 | - | - | 1997 |
| 34/8-A-1 BH | 3,6 | 6 039,0 | - | - | 1998 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 462,0 | 36" | 472,0 | - |
| Surface casing | 20" | 1 177,0 | 26" | 1 205,0 | 1,66 LOT |
| Intermediate | 13 3/8" | 2 680,0 | 17 1/2" | 2 700,0 | 1,80 LOT |
Mud weight
44 measurements, one dot each, 1,00 to 1,70 g/cm³ against measured depth, water based.