Fields / 35/9-9
35/9-9
Exploration, wildcatPlugged and abandonedDry
Drilled by GDF SUEZ E&P Norge AS with Transocean Barents, 04.10.2013 to 18.11.2013 (45 days), to 3 339,0 m.
Water depth360,0 m
Total depth3 339,0 m MD
Vertical depth3 338,0 m TVD
Bottom-hole temperature-
Max inclination5,3°
Rotary table40,0 m
Formation at total depth-
RigTransocean Barents
Spud04.10.2013
Completed18.11.2013
OperatorGDF SUEZ E&P Norge AS
Position61,4035 N, 3,9335 E
Formations
33 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/9-15 A | 2,2 | 3 250,0 | - | - | 2020 |
| 35/9-15 B | 2,2 | 3 335,0 | - | - | 2020 |
| 35/9-15 S | 2,2 | 2 520,0 | - | - | 2020 |
| 35/9-F-1 AH | 3,1 | 2 350,0 | - | - | 2009 |
| 35/9-F-1 H | 3,1 | 3 034,0 | - | - | 2009 |
| 35/9-U-2 | 3,1 | 924,0 | - | - | 2009 |
| 35/9-1 | 3,4 | 2 350,0 | 60 °C | 1,28 | 1989 |
| 35/9-1 R | 3,4 | 2 350,0 | 82 °C | - | 1989 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 459,5 | 36" | 564,0 | - |
| Surface casing | 20" | 1 092,0 | 26" | 1 103,0 | 1,43 LOT |
| Pilot hole | - | 1 105,0 | 9 7/8" | 1 105,0 | - |
| Open hole | - | 1 142,0 | 17 1/2" | 1 142,0 | - |
| Intermediate | 9 5/8" | 2 488,0 | 12 1/4" | 2 493,0 | 1,75 FIT |
| Open hole | - | 3 339,0 | 8 1/2" | 3 339,0 | - |
Mud weight
7 measurements, one dot each, 1,00 to 1,34 g/cm³ against measured depth, glydril, spud mud.