WellplannerNorwegian shelf well data

Fields / Tyrihans / 6407/1-B-1 H

6407/1-B-1 H

Development, observationPluggedOil

Drilled by StatoilHydro ASA with Transocean Arctic in Tyrihans, 15.06.2008 to 03.07.2008 (18 days), to 3 950,0 m.

Water depth275,0 m
Total depth3 950,0 m MD
Vertical depth3 640,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigTransocean Arctic
Spud15.06.2008
Completed03.07.2008
OperatorStatoilHydro ASA
Position64,8116 N, 7,0567 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Tyrihans gradient37,2 °C/km
Estimated at total depth from the gradient128 °C

The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/1-B-1 AH same well0,06 012,0--2008
6407/1-B-4 AY1H0,06 223,0--2012
6407/1-B-4 AY2H0,07 200,0--2012
6407/1-B-4 H0,04 168,0--2012
6407/1-B-2 H0,04 590,0--2025
6407/1-B-3 H0,04 025,0--2008
6407/1-11,7900,027 °C1,081982
6407/1-21,84 560,0159 °C1,711982

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗