Fields / Tyrihans / 6407/1-B-3 H
6407/1-B-3 H
Development, injectionProducingGas
Drilled by StatoilHydro ASA with Transocean Arctic in Tyrihans, 21.04.2008 to 11.06.2008 (51 days), to 4 025,0 m.
Water depth275,0 m
Total depth4 025,0 m MD
Vertical depth3 868,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigTransocean Arctic
Spud21.04.2008
Completed11.06.2008
OperatorStatoilHydro ASA
Position64,8117 N, 7,0568 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Tyrihans gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 137 °C |
The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/1-B-2 H | 0,0 | 4 590,0 | - | - | 2025 |
| 6407/1-B-4 AY1H | 0,0 | 6 223,0 | - | - | 2012 |
| 6407/1-B-4 AY2H | 0,0 | 7 200,0 | - | - | 2012 |
| 6407/1-B-4 H | 0,0 | 4 168,0 | - | - | 2012 |
| 6407/1-B-1 AH | 0,0 | 6 012,0 | - | - | 2008 |
| 6407/1-B-1 H | 0,0 | 3 950,0 | - | - | 2008 |
| 6407/1-1 | 1,8 | 900,0 | 27 °C | 1,08 | 1982 |
| 6407/1-2 | 1,8 | 4 560,0 | 159 °C | 1,71 | 1982 |
Casing and formation tests
No casing programme is reported for this wellbore.