Fields / 6407/1-B-2 H
6407/1-B-2 H
Exploration, wildcatPluggedOil and gas and condensate
Drilled by Equinor Energy AS with Transocean Encourage, 16.09.2025 to 22.12.2025 (97 days), to 4 590,0 m.
Water depth275,0 m
Total depth4 590,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigTransocean Encourage
Spud16.09.2025
Completed22.12.2025
OperatorEquinor Energy AS
Position64,8117 N, 7,0567 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/1-B-3 H | 0,0 | 4 025,0 | - | - | 2008 |
| 6407/1-B-1 AH | 0,0 | 6 012,0 | - | - | 2008 |
| 6407/1-B-1 H | 0,0 | 3 950,0 | - | - | 2008 |
| 6407/1-B-4 AY1H | 0,0 | 6 223,0 | - | - | 2012 |
| 6407/1-B-4 AY2H | 0,0 | 7 200,0 | - | - | 2012 |
| 6407/1-B-4 H | 0,0 | 4 168,0 | - | - | 2012 |
| 6407/1-1 | 1,8 | 900,0 | 27 °C | 1,08 | 1982 |
| 6407/1-2 | 1,8 | 4 560,0 | 159 °C | 1,71 | 1982 |
Casing and formation tests
No casing programme is reported for this wellbore.