Fields / Heidrun / 6507/8-E-1 AH
6507/8-E-1 AH
Development, productionPluggedOil
Drilled by Den norske stats oljeselskap a.s with Mærsk Jutlander in Heidrun, 13.10.2000 to 18.11.2000 (36 days), to 3 010,0 m.
Water depth355,0 m
Total depth3 010,0 m MD
Vertical depth2 589,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud13.10.2000
Completed18.11.2000
OperatorDen norske stats oljeselskap a.s
Position65,3832 N, 7,3694 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 88 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-E-1 BH same well | 0,0 | 4 006,0 | - | - | 2002 |
| 6507/8-E-1 CH same well | 0,0 | 3 169,0 | - | - | 2016 |
| 6507/8-E-1 H same well | 0,0 | 3 229,0 | - | - | 2000 |
| 6507/8-E-4 AH | 0,0 | 3 415,0 | - | - | 2006 |
| 6507/8-E-4 H | 0,0 | 2 830,0 | - | - | 2001 |
| 6507/8-E-2 AH | 0,0 | 4 115,0 | - | - | 2001 |
| 6507/8-E-2 BH | 0,0 | 3 909,0 | - | - | 2001 |
| 6507/8-E-2 CH | 0,0 | 4 733,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.