Fields / Heidrun / 6507/8-E-2 BH
6507/8-E-2 BH
Development, productionPluggedOil
Drilled by Statoil ASA (old) with Transocean Prospect in Heidrun, 30.07.2001 to 08.08.2001 (9 days), to 3 909,0 m.
Water depth355,0 m
Total depth3 909,0 m MD
Vertical depth2 363,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Prospect
Spud30.07.2001
Completed08.08.2001
OperatorStatoil ASA (old)
Position65,3833 N, 7,3694 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-E-2 AH same well | 0,0 | 4 115,0 | - | - | 2001 |
| 6507/8-E-2 CH same well | 0,0 | 4 733,0 | - | - | 2021 |
| 6507/8-E-2 H same well | 0,0 | 2 815,0 | - | - | 2001 |
| 6507/8-E-3 AH | 0,0 | 2 970,0 | - | - | 2000 |
| 6507/8-E-3 BH | 0,0 | 3 562,0 | - | - | 2000 |
| 6507/8-E-3 CH | 0,0 | 4 340,0 | - | - | 2000 |
| 6507/8-E-3 DH | 0,0 | 3 191,0 | - | - | 2001 |
| 6507/8-E-3 EH | 0,0 | 2 655,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.