WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/8-E-2 AH

6507/8-E-2 AH

Development, productionPluggedOil

Drilled by Statoil ASA (old) with Transocean Prospect in Heidrun, 01.07.2001 to 28.07.2001 (27 days), to 4 115,0 m.

Water depth355,0 m
Total depth4 115,0 m MD
Vertical depth2 352,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Prospect
Spud01.07.2001
Completed28.07.2001
OperatorStatoil ASA (old)
Position65,3833 N, 7,3694 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient79 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/8-E-2 BH same well0,03 909,0--2001
6507/8-E-2 CH same well0,04 733,0--2021
6507/8-E-2 H same well0,02 815,0--2001
6507/8-E-3 AH0,02 970,0--2000
6507/8-E-3 BH0,03 562,0--2000
6507/8-E-3 CH0,04 340,0--2000
6507/8-E-3 DH0,03 191,0--2001
6507/8-E-3 EH0,02 655,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗