WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/8-E-2 H

6507/8-E-2 H

Development, observationPlugged

Drilled by Den norske stats oljeselskap a.s with Transocean Prospect in Heidrun, 13.01.2001 to 12.03.2001 (58 days), to 2 815,0 m.

Water depth355,0 m
Total depth2 815,0 m MD
Vertical depth2 341,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Prospect
Spud13.01.2001
Completed12.03.2001
OperatorDen norske stats oljeselskap a.s
Position65,3833 N, 7,3694 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient78 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/8-E-2 AH same well0,04 115,0--2001
6507/8-E-2 BH same well0,03 909,0--2001
6507/8-E-2 CH same well0,04 733,0--2021
6507/8-E-3 AH0,02 970,0--2000
6507/8-E-3 BH0,03 562,0--2000
6507/8-E-3 CH0,04 340,0--2000
6507/8-E-3 DH0,03 191,0--2001
6507/8-E-3 EH0,02 655,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗