WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/8-E-1 BH

6507/8-E-1 BH

Development, productionPluggedOil

Drilled by Statoil ASA (old) with Transocean Prospect in Heidrun, 29.08.2002 to 30.09.2002 (32 days), to 4 006,0 m.

Water depth355,0 m
Total depth4 006,0 m MD
Vertical depth2 473,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigTransocean Prospect
Spud29.08.2002
Completed30.09.2002
OperatorStatoil ASA (old)
Position65,3832 N, 7,3694 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient83 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/8-E-1 AH same well0,03 010,0--2000
6507/8-E-1 CH same well0,03 169,0--2016
6507/8-E-1 H same well0,03 229,0--2000
6507/8-E-4 AH0,03 415,0--2006
6507/8-E-4 H0,02 830,0--2001
6507/8-E-2 AH0,04 115,0--2001
6507/8-E-2 BH0,03 909,0--2001
6507/8-E-2 CH0,04 733,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗