7/12-3 A
Exploration, appraisalPlugged and abandonedOil shows
Drilled by BP Norway Limited U.A. with Norskald in Ula, 04.06.1977 to 06.09.1977 (94 days), to 4 191,0 m in the Zechstein Group.
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 163 °C |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 157 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-3 same well | 0,0 | 3 710,0 | - | 1,55 | 1977 |
| 7/12-6 | 2,1 | 3 700,0 | 153 °C | 1,50 | 1981 |
| 7/12-A-13 | 2,2 | 5 124,0 | - | - | 1989 |
| 7/12-A-13 A | 2,2 | 4 469,0 | - | - | 1989 |
| 7/12-A-13 B | 2,2 | 4 985,0 | - | - | 2019 |
| 7/12-A-13 C | 2,2 | 6 272,0 | - | - | 2019 |
| 7/12-A-14 | 2,2 | 3 693,0 | - | - | 1992 |
| 7/12-A-14 A | 2,2 | 4 531,0 | - | - | 2001 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 169,0 | 36" | 174,0 | - |
| Surface casing | 20" | 466,0 | 26" | 470,0 | - |
| Intermediate | 13 3/8" | 1 679,0 | 17 1/2" | 1 686,0 | - |
| Intermediate | 9 5/8" | 3 601,0 | 12 1/2" | 3 612,0 | - |
| Open hole | - | 4 190,0 | 8 1/2" | 4 190,0 | - |
Mud weight
5 measurements, one dot each, 1,40 to 1,46 g/cm³ against measured depth, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 2 | 3 673,0 - 3 662,0 | - | - | - | - | - |
| 1 | 3 771,0 - 3 716,0 | - | - | - | - | - |