PL 869
ActiveProduction period
Production licence 869 was granted 10.02.2017. It is in its production period and valid to 05.06.2049. Aker BP ASA is the operator, with two licensees in all.
Granted10.02.2017
Valid to05.06.2049
PhaseProduction period
Licensing roundTFO2016
Area granted312 km²
Area now35 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 80 % |
| Concedo AS | 20 % |
Wellbores drilled in PL 869
6 wellbores, 6 of them exploration, newest first.
| Wellbore | Field | Type | Status | Total depth, m | Spud |
|---|---|---|---|---|---|
| 24/12-8 S | - | Exploration | Plugged and abandoned | 2 416,0 | 24.12.2024 |
| 24/9-13 A | - | Exploration | Plugged and abandoned | 3 466,0 | 17.07.2019 |
| 24/9-13 | - | Exploration | Plugged and abandoned | 2 305,0 | 16.06.2019 |
| 24/9-14 A | - | Exploration | Plugged and abandoned | 4 432,0 | 23.02.2019 |
| 24/9-14 S | - | Exploration | Plugged and abandoned | 2 286,0 | 19.01.2019 |
| 24/9-13 B | - | Exploration | Will never be drilled | - | - |
Licensees over time
9 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 31.10.2024 | - | Aker BP ASA ; Concedo AS |
| 01.01.2023 | 30.10.2024 | Aker BP ASA ; Vår Energi ASA |
| 30.06.2022 | 31.12.2022 | Aker BP ASA ; Vår Energi ASA ; ABP Norway AS |
| 28.01.2022 | 29.06.2022 | Aker BP ASA ; Vår Energi ASA ; Lundin Energy Norway AS |
| 30.06.2021 | 27.01.2022 | Aker BP ASA ; Vår Energi AS ; Lundin Energy Norway AS |
| 01.04.2020 | 29.06.2021 | Aker BP ASA ; Lundin Energy Norway AS ; Vår Energi AS |
| 10.12.2018 | 31.03.2020 | Aker BP ASA ; Lundin Norway AS ; Vår Energi AS |
| 27.04.2018 | 09.12.2018 | Aker BP ASA ; Lundin Norway AS ; Point Resources AS |
| 10.02.2017 | 26.04.2018 | Aker BP ASA ; Fortis Petroleum Norway AS ; Lundin Norway AS ; Point Resources AS |