WellplannerNorwegian shelf well data

Fields / Tambar / 1/3-3

1/3-3

Exploration, wildcatPlugged and abandonedOil

Drilled by Elf Petroleum Norge AS with Borgsten Dolphin in Tambar, 22.08.1982 to 24.03.1983 (214 days), to 4 876,0 m in the Zechstein Group.

Water depth68,0 m
Total depth4 876,0 m MD
Vertical depth4 875,0 m TVD
Bottom-hole temperature179 °C
Max inclination-
Rotary table25,0 m
Formation at total depthZechstein Group
RigBorgsten Dolphin
Spud22.08.1982
Completed24.03.1983
OperatorElf Petroleum Norge AS
Position56,9524 N, 2,9817 E

Formations

27 tops reported, measured depth in metres.

GroupsNordland Group, top 93,0 mNordland GpHordaland Group, top 1 647,0 mHordaland GpRogaland Group, top 2 936,0 mRogaland GpShetland Group, top 3 201,0 mShetland GpCromer Knoll Group, top 3 887,0 mTyne Group, top 4 043,0 mVestland Group, top 4 178,0 mVestland GpNo Group Defined, top 4 620,0 mNo Gp DefinedZechstein Group, top 4 820,0 mFormationsBalder Formation, top 2 936,0 mSele Formation, top 2 984,0 mLista Formation, top 2 991,0 mVidar Formation, top 3 059,0 mLista Formation, top 3 148,0 mVåle Formation, top 3 180,0 mEkofisk Formation, top 3 201,0 mTor Formation, top 3 288,0 mTor FmHod Formation, top 3 803,0 mBlodøks Formation, top 3 852,0 mRødby Formation, top 3 887,0 mMandal Formation, top 4 043,0 mFarsund Formation, top 4 112,0 mUla Formation, top 4 178,0 mNo Formal Name, top 4 323,5 mUla Formation, top 4 435,0 mBryne Formation, top 4 542,0 mSmith Bank Formation, top 4 620,0 mSmith Bank Fm931 0002 0003 0004 0004 876

Temperature

Reported at total depth179 °C
Drill-stem test at 4 214,0 m165 °C

2 released wells in Tambar report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-102,84 525,0163 °C1,611991
1/3-K-63,75 713,0--2001
1/3-K-43,76 436,0--2017
1/3-K-53,75 268,0--2007
1/3-K-5 A3,76 301,0--2007
1/3-K-5 B3,75 978,0--2025
1/3-9 S3,74 516,0168 °C1,701998
1/3-K-13,74 543,0--1998

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"153,036"155,0-
Surface casing20"697,026"710,01,80 LOT
Intermediate13 3/8"1 902,017 1/2"1 912,01,81 LOT
Intermediate9 5/8"4 047,012 1/4"4 060,02,21 LOT
Liner7"4 800,08 1/2"4 875,0-

Mud weight

10 measurements, one dot each, 1,00 to 1,57 g/cm³ against measured depth, waterbased.

1,01,21,41,601 0002 0003 0004 000160,0 m: 1,07 g/cm³, waterbased330,0 m: 1,10 g/cm³, waterbased710,0 m: 1,13 g/cm³, waterbased850,0 m: 1,16 g/cm³, waterbased1 260,0 m: 1,18 g/cm³, waterbased1 490,0 m: 1,23 g/cm³, waterbased1 840,0 m: 1,43 g/cm³, waterbased2 250,0 m: 1,50 g/cm³, waterbased3 420,0 m: 1,55 g/cm³, waterbased4 850,0 m: 1,57 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
3.14 202,0 - 4 208,050,8----
3.34 211,0 - 4 214,06,4-16514328 000
24 233,0 - 4 240,09,5----
14 529,0 - 4 552,025,4----